CASE STUDIES

ROYAL BRITISH LEGION
Due to the Covid-19 pandemic, the UK’s largest Armed Forces charity, Royal British Legion, required a modern, flexible remote access control system for their pop-in stores, complete with intruder detection to allow for the remaining part of the office to be sublet.

UTILITIES PROVIDER
An energy solutions provider instructed Monatrix to design and install a fully integrated security system at their office’s that are not running 24 hours a day. The new system would remove the need for an onsite security guard when the site is inoperative, and allow the site to be monitored and controlled by their head office.

FLOGAS
LPG supplier, Flogas approached Monatrix to install perimeter securing measures to their site in Bristol. Initially, the customer’s intention was for the systems to be installed individually, however, Monatrix proposed a fully integrated security system, complete with out of hours monitoring by an ARC.

MACDONALD HOTELS
4* hotel Botley Park is a luxury hotels spread across many separate buildings in the estate and surrounding grounds. The hotel runs on a very old CCTV system installed utilising analogue coax cabling infrastructure.

AUTOMOTIVE MANUFACTURER
The client a global automotive manufacturer with an on site testing facility, faced significant challenges with their outdated manual system for managing test tracks and a growing number of test drivers, they required a modern, digital solution to streamline their operations and enhance safety measures.
